The sink is 99.9% completed and ready to go! All that’s left is to buy a rug to cover the board, and to tape it down on all sides.

Here’s what’s been completed:

1. The building of the box. All items: DVR box, channel selector, and wireless receiver were lovingly placed in a clear tupperware box. That tupperware box was placed inside a bigger box with several holes cut in it for ventilation and for the infrared remote to function.

img_1000.jpg
img_1016.jpg

2. Box platform with rubber feet installed to keep the box away from water.

_mg_8710.jpg

3. Mat sensor wired and ready to go! Ping did an awesomeee job with this. I know we MDP kids are infamous in the shop. Apparently, the question of the day yesterday in the shop was, “how many MDP students does it take to put together two pieces of wood?”

_mg_8714.jpg

4. As of 11:00 AM, all sink and sink related parts are set up at Julia’s house in her baby-sized kitchen for testing.

_mg_8708.jpg_mg_8707.jpg_mg_8709.jpg_mg_8712.jpg

I’ll keep everyone posted on how things are going with the testing. So far, so good, though! Just a side note, too–I’m going to UPS to ship out a bunch of stuff for returns today.

That’s all, bye!

Julia